Communication

What does that meeting cost? Pricing your team's calendar

How to calculate the real cost of a meeting, why recurring meetings are a hidden budget line, and a simple audit that gives engineers their time back.

· 5 min read

A one-hour meeting with eight engineers is not an hour. It is eight hours of engineering time. At a fully loaded cost of $100 an hour, that is $800 — and if it runs weekly, about $40,000 a year. Few managers could spend $40,000 on a tool without a business case. Anyone can create a recurring meeting.

The formula

Meeting cost = attendees × hours × loaded hourly cost. Multiply by how often it runs to get the annual figure. Loaded cost is salary plus benefits, taxes and overhead, usually 1.25 to 1.4 times base salary, divided by roughly 1,800 working hours a year.

The formula still undercounts, because it ignores fragmentation. A 30-minute meeting at 2:30 pm can cost an engineer the whole afternoon: the time before it is too short to start anything hard, and the time after goes on getting back into context. Paul Graham called this the difference between the manager's schedule and the maker's schedule.

Every meeting needs a type

  • Decide: needs a decision-maker, a pre-read and only the people who contribute.
  • Inform: usually better as a written update people can read in five minutes.
  • Generate: brainstorming and design discussion; small groups work best.
  • Connect: one-on-ones, team rituals, social time. Valuable, but be deliberate about it.

If you cannot say which type a meeting is, it probably has no purpose.

A two-week calendar audit

  • List every recurring meeting your team attends and price each one.
  • Cancel them all for two weeks, and explain why in writing.
  • Bring back only the ones people miss — with an agenda, an owner and fewer attendees.
  • Replace status meetings with a short written weekly update.
  • Cluster what remains, and protect at least two half-day blocks of focus time a week.

Teams that try this usually find that fewer than half their meetings come back. The ones that do come back are better, because someone had to argue for them.

Use the calculator below to price your own calendar. Then show the number to whoever owns the meeting. It is a far easier conversation than “this meeting is a waste of time”.

Try it — Meeting cost

Each meeting

$800

Per year

$38,400

People-hours a year

384

Engineer-weeks a year

9.6

Assumes 48 working weeks a year. The cost leaves out context switching: a meeting in the middle of a block of deep work costs more than its length.

Quick check

3 questions from the related lessons. Answers are explained, and the ones you get right count towards your progress.

Question 1

Q1.Six people attend a 90-minute meeting. Their loaded cost is $120 an hour each. What does the meeting cost, in dollars?

Question 2

Q2.Five engineers have an average base salary of $150,000 and the load factor is 1.3. What is the team's annual fully loaded cost, in dollars?

Question 3

Q3.A team runs at 80% utilization. What is the queue wait factor, ρ ÷ (1 − ρ)?

Practice this in a lesson